Difference between revisions of "Final Project"
From ENGR005 2008
(→Teams/Projects) |
|||
(14 intermediate revisions by 8 users not shown) | |||
Line 29: | Line 29: | ||
* The oral project presentation should be from 5-8 minutes in length. | * The oral project presentation should be from 5-8 minutes in length. | ||
* I recommend powerpoint (or something similar) on flash drive. | * I recommend powerpoint (or something similar) on flash drive. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
* The final project presentation will be given on Tuesday 12/9 in Hicks 213 (same schedule). | * The final project presentation will be given on Tuesday 12/9 in Hicks 213 (same schedule). | ||
** The schedule is very tight - if we start to run over schedule, you may not be able to finish your practice presentation. | ** The schedule is very tight - if we start to run over schedule, you may not be able to finish your practice presentation. | ||
Line 49: | Line 44: | ||
* 11:32 Balch / Scheuing | * 11:32 Balch / Scheuing | ||
* 11:44 Bertaut / Bielenberg | * 11:44 Bertaut / Bielenberg | ||
− | * 11:56 Burger / Chien / Eyerer / Novack | + | * 11:56 Burger / Chien / Eyerer / Novack |
− | * 12:08 Hunter | + | * 12:08 Hunter |
− | * 12:20 Dyer / | + | * 12:20 Dyer / Heavenrich |
− | * 12:32 Goff | + | * 12:32 Goff |
====Lab B==== | ====Lab B==== | ||
Line 59: | Line 54: | ||
* 1:39 Cabrera / Rutherford / Spector / Williams | * 1:39 Cabrera / Rutherford / Spector / Williams | ||
* 1:51 Parasrampuria / Chasins | * 1:51 Parasrampuria / Chasins | ||
− | * 2:03 Bhandari | + | * 2:03 Bhandari / Nolan / Pytlar / Zhao |
− | * 2:17 Saltzman | + | * 2:17 Saltzman |
====Lab C==== | ====Lab C==== | ||
− | * 2:40 Martin (also - need to start wiki) | + | * 2:40 Pollen |
− | + | * 2:52 Martin (also - need to start wiki) | |
− | * 3:04 | + | * 3:04 Koonce |
* 3:16 Pezzola / Weiner | * 3:16 Pezzola / Weiner | ||
* 3:28 Stromme / Weinhold (also - need to start wiki) | * 3:28 Stromme / Weinhold (also - need to start wiki) | ||
Line 76: | Line 71: | ||
==Teams/Projects== | ==Teams/Projects== | ||
− | [[Swat.Solar.]] | + | |
+ | '''[[Swat.Solar.]]''' | ||
[[Disco Board Project]] | [[Disco Board Project]] | ||
Line 84: | Line 80: | ||
[[Hogwarts Interactive]] | [[Hogwarts Interactive]] | ||
− | [[Robotic Arm | + | [[Robotic Arm Deux]] |
[[MatLab Tic-Tac-Toe]] | [[MatLab Tic-Tac-Toe]] | ||
Line 99: | Line 95: | ||
[[Dart Blaster]] | [[Dart Blaster]] | ||
+ | |||
+ | [[Servo Vehicle ]] | ||
[[Battleship!]] | [[Battleship!]] | ||
+ | |||
+ | [[Rubik's Cube]] | ||
==Individual Projects== | ==Individual Projects== | ||
[[Prosthetics]] | [[Prosthetics]] | ||
+ | |||
+ | [[Omni Directional Wheels]] | ||
+ | |||
+ | [[Projectile Launcher]] | ||
+ | |||
+ | [[Piano-Playing Robot Arm]] |
Latest revision as of 21:50, 8 December 2008
Contents
ENGR 005, 2008 - Final Project
Guidelines
The final project for ENGR 005 is self-defined. The guidelines are as follows:
- The project may be a group or individual project
- You may do a project or research report (I prefer project)
- Groups can be up to 4 people – not necessarily from your lab section
- Project can be anything you think you can do in 2-3 weeks (6-10 hours).
- If you need extra supplies (up to about $40) let me know by Monday (11/17) so we can order.
- Research project is OK, but some of your references have to be print-based (i.e., not just URL’s)
Suggestions
Project proposal
- Oral proposal during lab Thursday, November 20th
- by the morning of Wednesday, November 19th, let me know in which lab period (A 11:20; B 1:15; C 2:40) you prefer to give your presentation. If possible, also give me an alternate (in case everybody chooses period A).
- I would like you to give me a paper with name of project, and name of group member(s) on 11/20.
- Presentation is 3-5 minutes by anybody in group (I realize that all group members may not be able to attend due to class conflicts).
- Include:
- Motivation for project
- Description of project, including block diagram with major components (software and/or hardware)
- Time line
- Any equipment required
- Members of group
Oral Project Presentation
Guidelines
- The oral project presentation should be from 5-8 minutes in length.
- I recommend powerpoint (or something similar) on flash drive.
- The final project presentation will be given on Tuesday 12/9 in Hicks 213 (same schedule).
- The schedule is very tight - if we start to run over schedule, you may not be able to finish your practice presentation.
- I would like you to come to the entire class on Tuesday 12/9 for the final presentations.
- Include:
- Description of the proposed project
- Theory (if any)
- Procedure (including difficulties)
- Results/demo as appropriate (I realize this may not be complete by 12/4)
Schedule
Lab A
- 11:20 Alade / Nicoludis
- 11:32 Balch / Scheuing
- 11:44 Bertaut / Bielenberg
- 11:56 Burger / Chien / Eyerer / Novack
- 12:08 Hunter
- 12:20 Dyer / Heavenrich
- 12:32 Goff
Lab B
- 1:15 Blekicki / Dinh / Edwards
- 1:27 Bowers / D'Annunzio / Silverblatt-Buser
- 1:39 Cabrera / Rutherford / Spector / Williams
- 1:51 Parasrampuria / Chasins
- 2:03 Bhandari / Nolan / Pytlar / Zhao
- 2:17 Saltzman
Lab C
- 2:40 Pollen
- 2:52 Martin (also - need to start wiki)
- 3:04 Koonce
- 3:16 Pezzola / Weiner
- 3:28 Stromme / Weinhold (also - need to start wiki)
- 3:40 Chen / Erturk / Leland
Project report
- Projects will be on Wiki, started by 11/24
- Project Wiki completed by 12/10
- Oral Project Presentation on 12/9 during lab period (5-10 minutes). If it is a group project, presentation must be by somebody other than the person who did the proposal presentation.