Difference between revisions of "Team L"
From ENGR005_2012
(→Helen and Raundi) |
(→Final Design) |
||
Line 51: | Line 51: | ||
=== Model and Score === | === Model and Score === | ||
+ | |||
+ | |||
+ | [[File:Final Design]] | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | Mass: 0.97 | ||
+ | |||
+ | Displacement: 0.1279 | ||
+ | |||
+ | Score: 0.124063 or 0.12 (2SF) | ||
+ | |||
=== How we got there === | === How we got there === | ||
THE ISSUES, HOW THEY BOTH ARE SIMILAR | THE ISSUES, HOW THEY BOTH ARE SIMILAR |
Revision as of 19:30, 26 September 2012
Contents
Members
First Designs
Helen and Raundi
Design Score
Mass: 1.06
Displacement: 0.6021
Score: 0.6382
We first tried cutting some parallelograms and noticed that sharp edges created more stress. We added circles (thus the bone looking images) to lower the stresses. We then noticed that an elongated ellipse allowed us to remove more matter without creating a great amount of stress. The shape of the circle and the ellipse were the "best" shapes used, since their smooth or non-existant angles did not allow much stress to build.
Gustavo and Daniel
Design Score
Mass: 0.99
Displacement: 0.1269
Score: 0.1256
Final Design
Model and Score
Mass: 0.97
Displacement: 0.1279
Score: 0.124063 or 0.12 (2SF)
How we got there
THE ISSUES, HOW THEY BOTH ARE SIMILAR
HELEN AND RAUNDI DESIGN